Killara 24

Building a single storey Clarendon home

Site Excavation & Slab (Post #9)

Work on our site started on 04 Nov with Clarendon dumping a load of soil on our land for levelling. There was some cut and fill required on our block to make it level, but it was within 1m.
Some pics of the excavators in action.

Excavation site scrape

IMG_0611The End Result below !IMG_0617PIERING

 IMG_0641 IMG_0642 IMG_0643 IMG_0644WAFFLE PODS and IRON MESH

IMG_0664  IMG_0684 IMG_0685 IMG_0670  IMG_0672     IMG_0677 IMG_0679 IMG_0681 And the SLAB !

 IMG_0688

IMG_0689

IMG_0690

IMG_0691

EXTERNAL PLUMBING

External plumbing – laying pipes along the edges of the house to connect it either to street/rainwater tank/retention pit. Thsi was done today. One side is charged for us, other isn’t. IMG_0056

IMG_0057

IMG_0058

IMG_0060

IMG_0063

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Information

This entry was posted on November 13, 2014 by .
%d bloggers like this: